你好,欢迎来到世铝网 [请登录] [免费注册]
世铝网 铝业产品
您当前的位置: 世铝网 铝业产品 铝型材 CC-PDIL01 51405040-175光纤 3

CC-PDIL01 51405040-175光纤

加入收藏 举报
详细信息

Conduct various inspections before power outage


1. Open the control station cabinet door and observe if the card is working properly and if there are any fault displays;


2. Observe and record the existence of faults from the real-time monitoring fault diagnosis of each operating station;


3. Check whether the power box works normally, whether the power fan works, whether the 5V and 24V indicators are normal, measure and record the voltage values;


4. Backup configuration, PID parameters, drivers, and other necessary important data;


5. Check the power supply redundancy, which includes AC power supply redundancy and DC power supply redundancy. AC power supply redundancy: By disconnecting one of the redundant AC~220VAC incoming lines, half of the AC power supply circuit of the system loses power, but the system should still be able to operate normally. The redundancy testing method for DC power supply is as follows:


(1) Firstly, disconnect one power supply box and measure the voltage of 5V and 24V on the power terminals of each cage and cage motherboard;


(2) First connect one power supply box, then disconnect the other power supply box, and then measure the voltage of 5V and 24V on the power terminals of each cage motherboard. The 5V output voltage of the power box should be between 5.10V and 5.25V, and the 24V output voltage of the power box should be between 23.00V and 25.00V. If the voltage deviation is large, it needs to be checked and handled in a timely manner, otherwise it will affect the normal operation of the card.


6. Check the network cable and layout, check the connection and disconnection of the network cable, confirm whether the connection is in good contact, and replace the faulty cable in a timely manner;


7. UPS test: Test the power supply capacity of the UPS battery by disconnecting the UPS AC incoming line. UPS batteries should be discharged regularly, generally recommended once a month. Discharge method: Disconnect UPS AC power supply and use battery power until the battery is about to be discharged.


The above checks mainly focus on understanding the operating status of the system in advance. If there are any abnormal phenomena, they can be promptly resolved during parking.


免责声明:

AMIKON我们销售新产品和停产产品,独立渠道购买此类特色产品。阿米控不是本网站特色产品的授权分销商、经销商或代表。本网站上使用的所有产品名称/产品图片、商标、品牌和徽标均为其各自所有者的财产。带有这些名称,图片、商标、品牌和徽标的产品描述、描写或销售仅用于识别目的,并不表示与任何权利持有人有任何关联或授权。


YOKOGAWA EB402-11YOKOGAWA VI451-11Honeywell RM7800 L 1087
YOKOGAWA UM330-00YOKOGAWA AAI135-H03Honeywell 51204174-175
YOKOGAWA SSB401-13YOKOGAWA AAI835-H03HONEYWELL 621-9990
YOKOGAWA 436006 R1000YOKOGAWA PW482-11HONEYWELL 51304335-200
Yokogawa AS. V8219TBYOKOGAWA 2375A30HONEYWELL 621-9939
YOKOGAWA SEC401-11YOKOGAWA PW482-11MC-TDOY22 51204162-175
YOKOGAWA AAR145-S03YOKOGAWA 2375A30HONEYWELL 51204156-175
YOKOGAWA VI451-11YOKOGAWA EC401-11HONEYWELL 51401134-100
YOKOGAWA 237936YOKOGAWA ADV151-P13HONEYWELL 05701-A-0301
YOKOGAWA AAR145-S03YOKOGAWA AAM50Honeywell 05701-A-0301






联系方式
  • 联系人: 吴工 女士
  • 电话: 0592-5085207
  • 手机: 18030175270
  • 地址: 福建省 厦门市 思明区湖滨南路388号国贸大厦32D单元
还没找到合适的产品?
  • 01
  • 快速发布求购信息
  • 下一步
  • 02
  • 试试以下相关搜索:
  • 03
  • 联系cnal客服:
  • 致电: 0371-63388900
    马上启动您的快速采购通道!